Project IV
Full kitchen renovation in Bedminster
Year
09/2023
Project III
Year
09/2023
Custom bathroom vanity in Bedminster
Project II
Client
Name here
Year
09/04/2023
-I moved the fridge into the pantry on the other side of the kitchen by enlarging the pantry and installing waterline and electricity.
-Then I built a half-wall between the kitchen and living room and built an island next to itl with additional storage underneath and to the side. I could have added a center island but that would limit the space to move around in the kitchen
-The counter is in quartz and the backsplash is in marble. I installed new flooring.
-We finally reconfigured the placements of the stove etc to allow optimal utilization and ventilation.
This is a completely remodelled kitchen in the Meadows community in Hillsborough. The original kitchen had very limited counter space. We completely reconfigured the space. This was a bigger project that took 15 days.
Project I
Client
Name here
Year
09/04/2023
This was another kitchen I built in the Ridge townhouse community. The cabinets are solid wood in Shaker style in the Stone-colored stain. The counter and backsplash are both Quartz in Calacatta. The work finished in 4 days.
Day -45: Ordering cabinets (this color was not in stock so it took 6 weeks to arrive. In stock colors arrive in 10 days)
Day 0: Client cleans belongings out of kitchen. I assemble the RTA cabinets in my workshop
Day 1: Demolition
Day 2: Installing base cabinets. Taking measure for stone counter.
Day 3: Installing stone counter. Installing top cabinets. Done!